World Library  


Add to Book Shelf
Flag as Inappropriate
Email this Book

Exhibit R-2, Rdt&E Budget Item Justification

By Department of Defense

Click here to view

Book Id: WPLBN0000078078
Format Type: PDF eBook
File Size: 0.1 MB
Reproduction Date: 2005
Full Text

Title: Exhibit R-2, Rdt&E Budget Item Justification  
Author: Department of Defense
Volume:
Language: English
Subject: Military, Armed Forces., National defense.
Collections: Military and Armed Forces Library Collection
Historic
Publication Date:
Publisher: Department of Defense

Citation

APA MLA Chicago

Defense, D. O. (n.d.). Exhibit R-2, Rdt&E Budget Item Justification. Retrieved from http://hawaiilibrary.net/


Description
Government Reference Publication

Excerpt
Excerpt: (U) A. Mission Description and Budget Item Justification. Marine Helicopter Squadron One (HMX-1) is required to provide safe and timely transportation for the President and Vice President of the United States, heads of state and others as directed by the White House Military Office (WHMO). The global nature of these commitments requires HMX-1 aircraft to deploy worldwide and operate in varying environmental and climatic conditions without mission degradation. Currently two Type, Model, Series (TMS) aircraft are used by HMX-1 for the Presidential support mission ... the VH-3D and the VH-60N. Numerous modifications and improvements have been incorporated over the past several years to both aircraft commensurate with emerging technologies and White House requirements. In order for the VXX to be available to assume the Presidential vertical lift mission by 2008, three test article aircraft, five pilot production aircraft, system design and development efforts, maintenance trainers, and associated logistics must be initiated by 2005. In addition, 3 Low-Rate Initial Production aircraft will be procured starting in FY2008. These aircraft will provide production representative articles to complete operational testing. The VHXX program provides the replacement for the VH-3D Presidential helicopter. The following areas need to be explored: Nuclear Effects, E3 /TEMPEST certification requirements, Survivability (Vulnerability/Susceptibility), Facilities upgrade/modifications- Source Selection, Environmental Impact, Security, Cost Estimation, Requirements Analysis, Functional Analysis and Allocation, Risk Management, Crew System/Human Systems Integration (HSI), and Logistics Support Analysis. Contractor efforts are expected to include System Design and Development work, test article aircraft, and pilot production aircraft.

Table of Contents
Na

 

Click To View

Additional Books


  • Unexplored Territory or a Cross-Cultural... (by )
  • Appendix B Reconciliation Requirements f... (by )
  • Acceleration Rates 1978-1988 (by )
  • Exhibit R-2, Rdt&E Budget Item Justifica... (by )
  • Wargaming and Simulation Centers (by )
  • Military Law Review (by )
  • Department of Defense Directives System ... (by )
  • Air Force Materiel Command : In Support ... (by )
  • Lessons Learned from a Cmmi Sm Pilot (by )
  • Rdt&E Budget Item Justification Sheet (R... (by )
  • Letter to the Editor (by )
  • U.S. Department of Justice Office of Jus... (by )
Scroll Left
Scroll Right

 



Copyright © World Library Foundation. All rights reserved. eBooks from Hawaii eBook Library are sponsored by the World Library Foundation,
a 501c(4) Member's Support Non-Profit Organization, and is NOT affiliated with any governmental agency or department.